Projects
Commercial
Completed
Bandra Business Hub
Comprehensive waterproofing and structural repairs for a premium commercial complex near Bandra Kurla Complex (BKC).
14 Floors
12 Months
Bandra East, Mumbai
Residential
In Progress
Skyline Heights Apartments
High-rise residential building undergoing complete external wall waterproofing and painting works.
22 Floors
10 Months
Powai, Mumbai
Infrastructure
Completed
Eastern Express Flyover Repairs
Major expansion joint and waterproofing repair works completed along the Eastern Express Highway flyover segment.
3.2 km stretch
14 Months
Ghatkopar–Vikhroli, Mumbai
Healthcare
Completed
Sion Hospital Extension
Structural rehabilitation and protective coating works executed at the new Sion Hospital wing.
9 Floors
20 Months
Sion, Mumbai
Educational
Planning
Thane Polytechnic Campus
Comprehensive civil maintenance plan for Thane Polytechnic campus buildings including waterproofing, painting, and structural retrofitting.
4 Blocks
24 Months
Thane, Maharashtra
Industrial
Completed
MIDC Factory Rehabilitation
Industrial shed waterproofing and structural strengthening work at a manufacturing unit in MIDC area.
3 Units
8 Months
Taloja MIDC, Navi Mumbai